Boklink

BOKLINK SUITE Part of boklink.com — Native sync with Boklink Accounting, Inventory & B2B Portal

FROM SPREADSHEETS TO LIVE MRP

Replace spreadsheet reconciliation with operations that update as work happens.

Import products, materials, BOMs, stock, suppliers and open orders into a controlled system—then connect the channels and workflows your team already uses.

Manufacturing planners working with production and inventory records

SIGNS IT IS TIME TO SWITCH

Where workbook-based operations start to slow down

Multiple versions of truth

Copied files and private formulas make ownership and timing impossible to verify.

Growth creates more admin

Each new warehouse, channel and product multiplies manual updates.

Decisions use stale data

By the time a spreadsheet is reconciled, orders and inventory have already changed.

SAMPLE MIGRATION DATA

Size the work before moving it

Illustrative scope for a multi-location manufacturer. These figures describe the sample dataset.

Item master rows
2,480
BOM records
318
Stock locations
6

Spreadsheets vs Boklink

Compare what changes for the people who buy, plan, build and ship.

Daily tasks on both systems
TaskSpreadsheetsBoklink MRP
Stock by locationSeparate tabs reconciled on a scheduleReceipts, transfers and counts update location balances
Available to sellFormulas or manual reservationsCommitted and available quantities shown separately
OrdersCSV exports and manual handoffsConnected orders retain channel and fulfillment context
BOM changesCopies and formulas updated by file ownersProduct structures feed material and work-order planning
ReplenishmentDemand and supplier lead times combined by handReview buy or make suggestions against current requirements
Batch historyLot IDs and movements spread across filesRecorded receipts, consumption and shipments share lot history
CostsPrice and production calculations maintained separatelyRecorded material and operations inform actual cost
PermissionsAccess granted by file or sheetRoles control visibility and operational actions
IntegrationsRepeated imports and exportsSupported connections share operational transactions
Opening balance reviewCompare files and counts manuallyValidate named items, warehouses and opening quantities before cutover

THREE-STEP MIGRATION

Move your data and test the handoffs

  1. Import and validate

    Map existing items, units, stock and BOMs while identifying duplicates and format problems.

  2. Connect live workflows

    Link sales, purchasing, production and warehouse transactions to one item master.

  3. Go live with control

    Test opening balances, permissions and integrations before switching the source of truth.

Operations colleagues reviewing data for a manufacturing planning migration

ILLUSTRATIVE MIGRATION RESULT

Check what is ready before go-live

In the example workspace, 86% of mapped records have passed validation. The item master is marked ready, BOM entries are in review and opening stock still needs to be signed off by location.

A pilot team can then trace a test order through allocation, material planning and fulfillment and compare the posted quantities with its opening balances.

Boklink migration checklist showing item master, BOM import and opening stock readiness
Boklink MRP workspace · illustrative data

ILLUSTRATIVE EVALUATION STATEMENT

“Validate the opening stock, trial orders and work-order quantities before making Boklink your live source of truth.”

This is guidance for a sample evaluation scenario, not a customer testimonial or a claim of measured customer results.

FREQUENTLY ASKED QUESTIONS

Moving from spreadsheets to Boklink FAQ

What data can be migrated from spreadsheets?

Typical scope includes items, materials, BOMs, opening stock, suppliers and open orders, subject to implementation review.

Do we need to replace every current tool?

No. Relevant ecommerce, accounting, shipping or partner tools can remain connected.

How is migration validated?

Teams review mapped data, opening balances and test transactions before go-live approval.

When should a manufacturer move off spreadsheets?

Consider a live system when stock and orders must be reconciled across channels or locations, or when BOM changes routinely reach production late.

How long does a migration take?

Timing depends on data cleanup, locations, workflow scope and integration testing. Set the cutover date after the team has run a trial import.

How are duplicate SKUs and inconsistent units handled?

Normalize identifiers and units in the import mapping. Resolve duplicate or conflicting rows before approving the item master.

Can we start with a single warehouse or product family?

Yes. Define the pilot scope and verify which cross-location transactions or shared materials need to be included.

What should we test before cutover?

Test a receipt, a sale, a transfer and a representative work order. Reconcile opening balances by item and location before your team signs off.

How can we evaluate the cost of switching?

Compare the plan and implementation scope with your current reconciliation time, inventory adjustments and any manual integration work.

Scope your first migration

Bring your item master and a sample BOM. Review the records to import and the transactions to test together.

Scroll to Top