MANUFACTURING & MRP
Production & Compliance
Built to adapt to discrete & batch manufacturing verticals.
Learn
Everything You Need to Know About Boklink MRP
What is the difference between a traditional ERP and Boklink MRP? +
Traditional monolithic ERPs require 6–18 months and $50,000+ in consultants to configure. Boklink MRP delivers enterprise-grade multi-level BOMs, shop-floor scheduling, batch traceability, and automated purchasing in 3–6 weeks—while syncing natively with Boklink Accounting, QuickBooks Online, and Xero.
How long does implementation take, and do you migrate spreadsheets? +
Most manufacturers go live within 3 to 6 weeks. Your dedicated onboarding specialist imports your existing SKUs, multi-level BOMs, vendor price lists, and opening lot balances from Excel/CSV, QuickBooks, Fishbowl, or Katana at zero extra cost.
Does Boklink MRP support lot tracking, expiration dates & recalls? +
Yes. Every raw material receipt, intermediate sub-assembly, and finished batch carries full lot and serial genealogy with FEFO (First-Expired, First-Out) picking rules and 1-click audit recall reports.
Can we connect Shopify, Amazon, and our B2B wholesale buyers? +
Yes. Boklink MRP syncs real-time available-to-promise inventory across Shopify, WooCommerce, Amazon, and our built-in B2B Wholesale Customer Portal so sales orders automatically trigger material reservations and work orders.
How does Boklink MRP handle landed costs, freight, and tariffs? +
You can allocate ocean freight, customs duties, tariffs, and brokerage bills directly onto purchase orders by weight, volume, or value so unit COGS and gross margins reflect true landed costs.
Are shop-floor operators charged full user licenses? +
No. Every Boklink MRP plan includes unlimited shop-floor operator logins for tablets and barcode scanners so production workers can clock tasks and scan lots without per-seat penalties.
START HERE
Find answers by the work you do
Each role sees a different part of the same manufacturing record. Start with the area you own, then follow the links into the detailed guides.
BEFORE YOU START
What to have ready for a product walkthrough
A demo is most useful when it runs on your own operating data. These items are enough to begin; nothing here needs to be perfectly clean.
- One current order. A real or representative order with a promised date.
- One bill of materials. A multi-level BOM, including substitutions if you use them.
- Current stock positions. On-hand quantities by location, even if kept in a spreadsheet.
- One open problem. A shortage, late receipt or schedule change to trace end to end.
See the demo page for the full checklist.
DATA & MIGRATION
Data migration questions
Can messy spreadsheets be imported as they are?+
Start with a copy. The import process maps your columns to items, BOM levels, suppliers and opening balances, and flags duplicates or missing units for review before anything is committed.
How are multi-level BOMs checked after import?+
Compare level counts, component quantities and routing steps against a known finished product. Resolve any missing or circular references before releasing a work order against the imported structure.
What happens to historical lot balances?+
Opening lot quantities, receipt dates and expiry dates can be brought across as a dated snapshot. Historic movement history is usually kept as reference rather than recreated as live transactions.
Do supplier price lists need to be rekeyed?+
If your supplier list is in Excel or CSV, it can be mapped into the purchasing records. Confirm units of measure and lead times during mapping, since those values drive material requirement dates.
PLANS & LICENSING
Plans and licensing questions
How is the right plan size decided?+
Scope is based on the modules you need, the number of office users and the volume of manufacturing transactions. Bring your order and BOM counts to the walkthrough for a configuration discussion rather than a guessed tier.
Are shop-floor seats counted as office users?+
Operator access for scanning and task reporting is treated separately from office planning seats. Confirm the boundary for your site during scoping so the configuration matches how your team actually works.
Can modules be added later?+
Yes. Many teams begin with inventory and BOM control, then add purchasing, production or B2B ordering once the first workflow is stable. Review the current configuration before assuming a module is included.
Where can I compare plan scope?+
The pricing page shows the current package outline and the quote request form. Use it as a starting point, then confirm scope against your own workflow.
DATA CONTROL
Security and data control questions
Who can see cost and supplier pricing?+
Access follows roles. Purchasing prices, inventory valuations and margin figures can be limited to the teams that need them, while operators see only the work instructions relevant to their station.
Is there an audit trail for inventory changes?+
Receipts, issues, adjustments and transfers are recorded as transactions with user and date references. Use those records to trace a quantity back to the source document during a review.
Can I export my data?+
Standard exports cover items, BOMs, stock, orders and transactions. Confirm the export format and scope for your configuration before you rely on it for an external archive.
How are traceability records retained?+
Lot genealogy stays linked to receipts, work orders and shipments. Agree your retention and recall-report requirements during scoping so the record set matches your regulatory needs.
CONNECTED SYSTEMS
Integration questions
Which systems connect most often?+
Accounting, ecommerce channels and B2B ordering are common starting points. See the integrations page for the current list and confirm availability for your edition.
How often is inventory synchronized?+
Sync behaviour depends on the connection and configuration. Test a stock change and an order in a controlled scenario before promising availability to customers.
Is there an API for custom workflows?+
An open REST API is available for defined integrations. Scope the fields and write rules with your technical team so custom writes do not bypass approval or inventory controls.
What if a system is not on the list?+
Describe the data you need to exchange and the direction of the flow. A bounded export or import is often enough to start, with a fuller integration considered once the workflow is proven.
GLOSSARY
Plain-language terms
A short reference for the terms that appear across the product guides.
BOM (bill of materials)
The structured list of components, quantities and routing steps needed to build a product.
Net requirements
Demand minus usable stock and incoming supply, placed by need date and lead time.
FEFO
First-expired, first-out: picking the lot with the nearest expiry date first.
Available to promise
Stock that can be committed to a customer order after reservations and planned demand.
Routing
The ordered operations, work centres and time expectations used to build an item.
Landed cost
The unit cost after freight, duties and other documentable charges are allocated to a receipt.
NEXT STEP
Test the answer on your own order
Bring one BOM and one live operational problem. A short walkthrough will show which parts of the workflow fit and which need a different approach.