MANUFACTURING & MRP
Production & Compliance
Built to adapt to discrete & batch manufacturing verticals.
Learn
BOM & PRODUCTION CONTROL
Turn every bill of materials into an executable production plan.
Model subassemblies, variants, labor, overhead and scrap in a controlled BOM—then release work orders that operators can execute and managers can cost.
Define
Version-controlled structures
Create multi-level BOMs, alternates, yields, scrap factors and effective revisions for repeatable builds.
- Multi-level BOM revisions
- Discrete assembly and machinery
- Approve the BOM, routing, yield and costing assumptions.
Release
Executable work orders
Convert demand into work orders with required components, routing steps, due dates and operator priorities.
- Material and labor capture
- Food, cosmetics and formulas
- Reserve materials and publish prioritized work to the floor.
Close
Real consumption
Issue actual materials, labor and overhead instead of assuming every build matched the standard.
- Planned vs actual cost
- Subassembly and kitting operations
- Record output, scrap and actual cost for margin analysis.
ALL CAPABILITIES
Everything your team needs to run this workflow with less reconciliation.
Boklink MRP connects engineering definitions with material allocation, shop-floor progress and actual output so production changes do not disappear between departments.
Version-controlled structures
Create multi-level BOMs, alternates, yields, scrap factors and effective revisions for repeatable builds.
Executable work orders
Convert demand into work orders with required components, routing steps, due dates and operator priorities.
Real consumption
Issue actual materials, labor and overhead instead of assuming every build matched the standard.
Production variance
Compare expected and actual quantity, yield and cost while the cause is still actionable.
Multi-level BOM revisions
Approve the BOM, routing, yield and costing assumptions.
Material and labor capture
Reserve materials and publish prioritized work to the floor.
Planned vs actual cost
Record output, scrap and actual cost for margin analysis.
DESIGNED FOR OPERATIONS TEAMS
“One current operational record means planners, buyers, production and fulfillment can act without rebuilding the answer in spreadsheets.”
Illustrative evaluation statement — validate measurable outcomes with your own process and data.
COMMON QUESTIONS
Evaluate the workflow with practical answers.
Review exact configuration, integrations and implementation scope in a tailored demonstration.
Does Boklink MRP support multi-level BOMs?
Yes. A finished good can include subassemblies that each carry their own components, costs and revisions.
Can operators record actual material usage?
Yes. Work orders can capture actual issues, substitutions, output, labor and scrap instead of relying only on standard quantities.
How are manufacturing costs calculated?
Planned cost can combine materials, labor and overhead; actual cost reflects recorded consumption and production results.
CONNECTED MRP
Continue the workflow without another export.
SEE IT WITH YOUR DATA
Map this workflow to your factory.
Bring a BOM, item list or current process. We will show the operational handoffs that matter to your team.