MANUFACTURING & MRP
Production & Compliance
Built to adapt to discrete & batch manufacturing verticals.
Learn
Moving beyond spreadsheets
When production outgrows the spreadsheet.
The decision is less about rows and columns than about whether demand, inventory and production changes stay connected.
DECISION SUMMARY
Start with the job your system must do.
The decision is less about rows and columns than about whether demand, inventory and production changes stay connected.
PROCESS FIT
Replace manual handoffs with a shared operating record
Use a real order to trace where a spreadsheet starts: demand, a BOM, available material, a purchase decision and the production record. Mark where the same fact is entered twice.
- 01Customer demand
- 02BOM + stock check
- 03Buy or make
- 04Production record
Illustrative decision sequence — validate each step against your process.
DATA & CONTROL
Make data ownership visible before moving it
Inventory mismatches often begin with different update habits rather than a single bad formula. Agree on item identifiers, units, locations and who approves changes before selecting import rules.
- 01One item ID
- 02One unit rule
- 03One stock owner
- 04Reviewed changes
Illustrative decision sequence — validate each step against your process.
EVALUATION IN PRACTICE
Start with a bounded workflow, then validate exceptions
A parallel check against the existing workbook helps reveal special cases such as substitutions, partial receipts and scrap. Keep the spreadsheet as a reference until balances and outputs reconcile.
- 01Choose one product family
- 02Reconcile opening balances
- 03Test exceptions
- 04Approve next scope
Illustrative decision sequence — validate each step against your process.
SIDE-BY-SIDE EVALUATION
Compare evidence from the same workflow.
This checklist is a prompt for a product walkthrough, not a claim that feature names or plan boundaries are identical. Verify the current edition, configuration, integrations and scope with each vendor.
| Decision area | Boklink MRP · validate | Spreadsheets · verify |
|---|---|---|
| BOM and revision control | Review one current BOM, its substitutions and the way a revision reaches a released job. | List each workbook, formula owner and edit path; test what happens when a component changes. |
| Available vs. committed stock | Walk through an item with on-hand stock, open demand and incoming supply. | Identify which tabs or manual adjustments determine whether a quantity is truly available. |
| Material requirements | Check how dated demand becomes a reviewed buy-or-make action. | Trace how each workbook derives quantities, lead times and purchase timing. |
| Work orders and progress | Follow the planned quantity through issue, progress and completion records. | Find where operators report status and how planners learn about a blocked job. |
| Traceability and audit trail | Use one lot-sensitive example to review records from receipt through shipment. | Check whether changes and lot references are linked across files and transactions. |
| Adoption and ownership | Define the first workflow owner, source data and reconciliation sign-off. | Document workbook dependencies, permissions, backups and ongoing maintenance. |
Ask each vendor to demonstrate the workflow using the same sample data and success criteria.
WHO SHOULD SHORTLIST WHAT
Fit depends on your operating model.
Explore Boklink MRP if…
Teams coordinating BOMs, purchasing and work orders across multiple files or owners.
Your evaluation needs to connect material requirements, production decisions and inventory records in one manufacturing workflow.
Keep Spreadsheets in the conversation if…
A small operation with stable products, low transaction volume and a clear workbook owner may reasonably keep its current process.
Test the product scope, configuration and dependencies required for your specific workflow before making a trade-off.
MIGRATION & EVALUATION PLAN
Move forward with evidence, not assumptions.
Use these steps to reduce data and workflow uncertainty. They are evaluation checkpoints, not a promised implementation schedule.
- STEP 01
Inventory the workbooks
List the files, owners, linked sheets, item IDs, units and recurring exports involved in one product flow.
- STEP 02
Clean and reconcile a pilot set
Resolve duplicates, inactive items, BOM units and stock differences. Record agreed opening balances and exceptions.
- STEP 03
Test a representative order
Run one normal and one exception case; compare required material, purchasing and completion records with the current process.
- STEP 04
Approve the next scope
Use reconciled results and operator feedback to decide what to migrate next and which spreadsheets remain useful as reports.
Set acceptance criteria with your operations and finance owners. Confirm data mapping, integrations, responsibilities and timing with the selected vendor.
FAQ
Questions to ask before you choose.
Use the answers as a starting point, then verify details for your team and configuration.
Do we need to stop using spreadsheets immediately?
No. Keep source files available during a controlled pilot. Decide when a workflow is ready to become the system of record after its item, BOM and stock data reconcile.
What should we prepare for an MRP evaluation?
Bring a representative BOM, a recent production order, current stock by location and an example of a change that currently requires manual coordination.
Can spreadsheets still be useful after adopting MRP?
Yes. Teams may still export or analyze data in spreadsheets. The important decision is which system owns live item, inventory, purchasing and production transactions.
How do we avoid carrying spreadsheet errors forward?
Review identifiers, units, duplicates, formulas and opening balances before import, then compare a pilot workflow against known transactions.
SEE YOUR WORKFLOW IN CONTEXT
Bring one product and one real production question.
Review your BOM, stock position, production handoffs and exception scenario with the Boklink MRP team. Confirm product scope and fit against your requirements.