02 / PRODUCTION PLANNING
Build a schedule around materials and real production capacity.
Plan finished products and their subassemblies together. Use BOM revisions, routing steps, work-center calendars and due dates to see what can run now and what needs to move.
- Motor module
- Final assembly
- Quality check
- Shipment
HOW IT WORKS
Production Planning in three steps.
- STEP 01
Break demand into build steps
Expand the approved BOM into subassemblies and purchased components, then assign operations and run times.
- STEP 02
Set a feasible sequence
Schedule operations using working hours, material readiness and job priorities. Review dependencies before moving a job.
- STEP 03
Release work and share changes
Publish the work orders to the floor and pass dated component needs to purchasing. Review affected due dates when supply or capacity changes.
01 / DEMAND & BOM
Translate the sales order into dated build requirements.
Start with the accepted quantity and BOM revision. Separate what the shop must build from what the buyer must source, then place each requirement on the date it is needed.
| Level / item | Quantity | Need / action |
|---|---|---|
| 0 · Pump assembly | 40 finished units | Ship May 20 |
| 1 · Motor module | 40 subassemblies | Build May 16 before final assembly |
| 1 · Seal kit | 40 kits | Stage by May 18; four still to source |
Keep revision C on the job packet. Review any component substitution before it reaches the floor.
02 / ROUTING DEPENDENCIES
Schedule the operations in the order they can run.
A ship date is not a start date. Work backward from dispatch and leave time for inspection. Run the motor module ahead of final assembly, but gate the assembly start on seal-kit readiness.
- May 16
Motor module
Build and stage 40 modules ahead of final assembly.
- May 18
Final assembly
Start on Line 02 after material is staged; retain May 19 as a buffer.
- May 19
Quality check
Inspect the batch and resolve any holds before dispatch.
- May 20
Shipment
Release the inspected quantity to dispatch.
A slip at final assembly must be checked against quality and dispatch, not just against the assembly calendar.
03 / WORK-CENTER CAPACITY
Check the hours on the line before moving a job.
Compare routing hours with the time left after existing commitments. Keep line hours separate from labor hours: a four-hour operation staffed by two operators consumes four line hours and eight labor hours.
- Scheduled line time
- 8 hr
- Already committed
- 3 hr
- Free before WO-1042
- 5 hr
- Setup and run for WO-1042
- 4 hr
- Free after scheduling
- 1 hr
The one-hour balance is not enough for a second four-hour job. Check both line and crew availability before fitting it in.
04 / WHAT-IF PLANNING
Decide what to move when a receipt slips.
Run a late-receipt scenario before reissuing the schedule. Preserve work that can still run, check whether the remaining operations fit, and only change the customer promise when recovery is no longer feasible.
- Baseline
Kits clear before the May 18 slot
Keep Line 02 on May 18 and the May 19 inspection.
- Recovery
Kits land after the May 18 slot
Test the May 19 buffer against the inspector’s availability.
- Escalation
No feasible inspection before shipment
Ask sales to review the May 20 promise against the new plan.
Treat an unconfirmed receipt as a planning risk, not as stock available to issue.
05 / RELEASE CONTROL
Give each team one version of the plan.
A dated schedule can include tentative material and capacity. At release, confirm the current revision, staged quantities and named constraint owner so buyers and operators do not work from different copies.
- Planner
Approve the sequence
Release the revision C routing with the Line 02 slot and quality handoff.
- Buyer
Confirm the four-kit gap
Report the receipt and clearance timing against the May 18 need.
- Warehouse
Verify the staged kit
Reconcile usable material staged for the job before starting final assembly.
- Floor lead
Acknowledge the latest job packet
Use the released instruction revision and flag any remaining hold.
The planner retains the date decision; purchasing and the floor report changes back to that same order.
PUMP ASSEMBLY EXAMPLE
Check the handoffs before work is released.
The motor module must finish before final assembly. The seal kits are needed at assembly, not at shipment.
If material arrives late, review dependent operations and the customer promise before moving the job.
THE HANDOFF
What goes in. What comes out.
- INPUTS
- Confirmed orders · BOM revisions · Work-center calendars
- OUTPUT
- A dated schedule and component requirements
COMMON QUESTIONS
Production Planning FAQ
Can I plan multiple levels of subassemblies?
Yes. A finished product can have subassemblies with their own components, revisions and operations.
What should I check before rescheduling a job?
Review component readiness, dependent operations, available work-center time and the customer due date.
KEEP EXPLORING
Continue the manufacturing workflow.
PERSONALIZED WALKTHROUGH
See production planning with your own data.
Bring a multi-level BOM and a current schedule. Walk through where materials or work-center capacity constrain the plan.