Production Planning

02 / PRODUCTION PLANNING

Build a schedule around materials and real production capacity.

Plan finished products and their subassemblies together. Use BOM revisions, routing steps, work-center calendars and due dates to see what can run now and what needs to move.

WORK-CENTER SCHEDULESO-1042 · Pump assembly
Scheduled
  1. Motor module
  2. Final assembly
  3. Quality check
  4. Shipment
● SAMPLE DATAIllustrative workflow

HOW IT WORKS

Production Planning in three steps.

  1. STEP 01

    Break demand into build steps

    Expand the approved BOM into subassemblies and purchased components, then assign operations and run times.

  2. STEP 02

    Set a feasible sequence

    Schedule operations using working hours, material readiness and job priorities. Review dependencies before moving a job.

  3. STEP 03

    Release work and share changes

    Publish the work orders to the floor and pass dated component needs to purchasing. Review affected due dates when supply or capacity changes.

01 / DEMAND & BOM

Translate the sales order into dated build requirements.

Start with the accepted quantity and BOM revision. Separate what the shop must build from what the buyer must source, then place each requirement on the date it is needed.

SO-1042 · BOM revision C
SAMPLE DATA
Level / itemQuantityNeed / action
0 · Pump assembly40 finished unitsShip May 20
1 · Motor module40 subassembliesBuild May 16 before final assembly
1 · Seal kit40 kitsStage by May 18; four still to source

Keep revision C on the job packet. Review any component substitution before it reaches the floor.

02 / ROUTING DEPENDENCIES

Schedule the operations in the order they can run.

A ship date is not a start date. Work backward from dispatch and leave time for inspection. Run the motor module ahead of final assembly, but gate the assembly start on seal-kit readiness.

WO-1042 · Baseline route
SAMPLE DATA
  1. May 16

    Motor module

    Build and stage 40 modules ahead of final assembly.

  2. May 18

    Final assembly

    Start on Line 02 after material is staged; retain May 19 as a buffer.

  3. May 19

    Quality check

    Inspect the batch and resolve any holds before dispatch.

  4. May 20

    Shipment

    Release the inspected quantity to dispatch.

A slip at final assembly must be checked against quality and dispatch, not just against the assembly calendar.

03 / WORK-CENTER CAPACITY

Check the hours on the line before moving a job.

Compare routing hours with the time left after existing commitments. Keep line hours separate from labor hours: a four-hour operation staffed by two operators consumes four line hours and eight labor hours.

Line 02 · May 18 capacity check
SAMPLE DATA
Scheduled line time
8 hr
Already committed
3 hr
Free before WO-1042
5 hr
Setup and run for WO-1042
4 hr
Free after scheduling
1 hr

The one-hour balance is not enough for a second four-hour job. Check both line and crew availability before fitting it in.

04 / WHAT-IF PLANNING

Decide what to move when a receipt slips.

Run a late-receipt scenario before reissuing the schedule. Preserve work that can still run, check whether the remaining operations fit, and only change the customer promise when recovery is no longer feasible.

Seal kits · Receipt scenario
SAMPLE DATA
  • Baseline

    Kits clear before the May 18 slot

    Keep Line 02 on May 18 and the May 19 inspection.

  • Recovery

    Kits land after the May 18 slot

    Test the May 19 buffer against the inspector’s availability.

  • Escalation

    No feasible inspection before shipment

    Ask sales to review the May 20 promise against the new plan.

Treat an unconfirmed receipt as a planning risk, not as stock available to issue.

05 / RELEASE CONTROL

Give each team one version of the plan.

A dated schedule can include tentative material and capacity. At release, confirm the current revision, staged quantities and named constraint owner so buyers and operators do not work from different copies.

WO-1042 · Release checklist
SAMPLE DATA
  • Planner

    Approve the sequence

    Release the revision C routing with the Line 02 slot and quality handoff.

  • Buyer

    Confirm the four-kit gap

    Report the receipt and clearance timing against the May 18 need.

  • Warehouse

    Verify the staged kit

    Reconcile usable material staged for the job before starting final assembly.

  • Floor lead

    Acknowledge the latest job packet

    Use the released instruction revision and flag any remaining hold.

The planner retains the date decision; purchasing and the floor report changes back to that same order.

PUMP ASSEMBLY EXAMPLE

Check the handoffs before work is released.

The motor module must finish before final assembly. The seal kits are needed at assembly, not at shipment.

If material arrives late, review dependent operations and the customer promise before moving the job.

THE HANDOFF

What goes in. What comes out.

INPUTS
Confirmed orders · BOM revisions · Work-center calendars
OUTPUT
A dated schedule and component requirements

COMMON QUESTIONS

Production Planning FAQ

Can I plan multiple levels of subassemblies?

Yes. A finished product can have subassemblies with their own components, revisions and operations.

What should I check before rescheduling a job?

Review component readiness, dependent operations, available work-center time and the customer due date.

PERSONALIZED WALKTHROUGH

See production planning with your own data.

Bring a multi-level BOM and a current schedule. Walk through where materials or work-center capacity constrain the plan.