Manufacturing Blog

Practical Manufacturing Guides

Clear explanations for BOM design, inventory control, material planning, traceability and implementation.

BOM

How to structure a multi-level BOM before migration

Revision control, phantom assemblies, scrap and routing decisions.

MRP

Net requirements without spreadsheet surprises

Demand, supply, safety stock and lead time in one example.

INVENTORY

A practical cycle-counting program

Improve accuracy without stopping the warehouse.

BILL OF MATERIALS

Structure the BOM before you migrate it

A migrated BOM carries every past shortcut. Fix the structure once, then import a version people can trust.

LEVELS

Decide where a sub-assembly really ends

Group components by the point where they become a traceable unit, not by who happens to build them.

REVISION

Keep one current revision

Archive superseded versions and record the effective date so a work order cannot pick the wrong structure.

SCRAP

Model scrap where it occurs

Put yield loss at the operation that creates it so requirement dates stay honest.

MATERIAL PLANNING

Net requirements without spreadsheet surprises

One worked example shows how demand, stock, open supply and lead time turn into a dated action list.

Start from a single order

Take one customer order with a promised date. Explode the BOM, subtract usable stock, then subtract open purchase and work orders that will land before the need date.

  • Demand: 100 units of a finished assembly
  • Usable stock: 40 units on hand, 20 allocated to another order
  • Open supply: one purchase order due before the need date

What the plan should tell you

The result is not just a quantity. It is a quantity with a date, an owner and a reason. If a component is short, the record should show which order is affected and what decision is needed.

INVENTORY CONTROL

A cycle-counting program that does not stop the warehouse

Accuracy improves through a repeatable rhythm, not a one-off full stocktake.

CLASSIFY

Count by value and movement

Give fast-moving, high-value items a shorter interval than stable bulk stock.

FREEZE

Freeze only the bin being counted

Scope the pause to one location so the rest of the warehouse keeps moving.

ADJUST

Investigate before you adjust

A variance usually points to a missing transaction; find it before changing the balance.

TRACEABILITY

Build a recall report before you need one

A traceability system is only as good as the question it can answer under pressure.

Ask both directions

From a supplier lot, list every work order and finished batch that consumed it. From a finished batch, list every component lot and shipment it touched. If either direction stops, the chain has a gap.

Use a sample scenario

Pick one received lot and run a mock recall on paper first. Note where the record is incomplete, then fix the transaction that caused it. Repeat until both directions complete.

COSTING

Landed cost: the charges that change your margin

Freight, duty and brokerage only affect unit cost when they are allocated to the receipt they belong to.

COLLECT

Keep every charge with its receipt

A supplier invoice without a receipt reference cannot be allocated to a specific unit cost.

ALLOCATE

Choose a basis your finance team accepts

Value, weight or volume each produce a different unit cost; document the choice.

REVIEW

Check the BOM afterwards

Confirm the new cost flowed into the product and that the quoted margin still holds.

IMPLEMENTATION

What to check before go-live

A short acceptance routine prevents most first-month surprises.

Run one family in parallel

Keep the old spreadsheet alongside the new system for one product family. Compare BOM levels, opening stock, requirement dates and job cost line by line.

Assign an owner to each difference

Every mismatch should have a person and a reason. Close the reasoning gaps before switching off the old record, not after.

SHOP FLOOR

Get operators to report progress without extra paperwork

Progress data is useful only when reporting it takes less effort than explaining it later.

SCAN

One scan to identify the job

Put the work order identifier where the operator already stands, not at a separate desk.

STAGES

Keep the status list short

Three or four clear states are easier to use than a detailed process taxonomy.

MATERIAL

Report use at the point of consumption

Recording material against the job as it is used keeps inventory and job cost aligned.

PUT IT TO WORK

Bring one BOM and one problem to a walkthrough

The guides explain the method. A session on your own data shows where it applies.