MANUFACTURING & MRP
Production & Compliance
Built to adapt to discrete & batch manufacturing verticals.
Learn
Practical Manufacturing Guides
Clear explanations for BOM design, inventory control, material planning, traceability and implementation.
How to structure a multi-level BOM before migration
Revision control, phantom assemblies, scrap and routing decisions.
Net requirements without spreadsheet surprises
Demand, supply, safety stock and lead time in one example.
A practical cycle-counting program
Improve accuracy without stopping the warehouse.
BILL OF MATERIALS
Structure the BOM before you migrate it
A migrated BOM carries every past shortcut. Fix the structure once, then import a version people can trust.
Decide where a sub-assembly really ends
Group components by the point where they become a traceable unit, not by who happens to build them.
Keep one current revision
Archive superseded versions and record the effective date so a work order cannot pick the wrong structure.
Model scrap where it occurs
Put yield loss at the operation that creates it so requirement dates stay honest.
MATERIAL PLANNING
Net requirements without spreadsheet surprises
One worked example shows how demand, stock, open supply and lead time turn into a dated action list.
Start from a single order
Take one customer order with a promised date. Explode the BOM, subtract usable stock, then subtract open purchase and work orders that will land before the need date.
- Demand: 100 units of a finished assembly
- Usable stock: 40 units on hand, 20 allocated to another order
- Open supply: one purchase order due before the need date
What the plan should tell you
The result is not just a quantity. It is a quantity with a date, an owner and a reason. If a component is short, the record should show which order is affected and what decision is needed.
INVENTORY CONTROL
A cycle-counting program that does not stop the warehouse
Accuracy improves through a repeatable rhythm, not a one-off full stocktake.
Count by value and movement
Give fast-moving, high-value items a shorter interval than stable bulk stock.
Freeze only the bin being counted
Scope the pause to one location so the rest of the warehouse keeps moving.
Investigate before you adjust
A variance usually points to a missing transaction; find it before changing the balance.
TRACEABILITY
Build a recall report before you need one
A traceability system is only as good as the question it can answer under pressure.
Ask both directions
From a supplier lot, list every work order and finished batch that consumed it. From a finished batch, list every component lot and shipment it touched. If either direction stops, the chain has a gap.
Use a sample scenario
Pick one received lot and run a mock recall on paper first. Note where the record is incomplete, then fix the transaction that caused it. Repeat until both directions complete.
COSTING
Landed cost: the charges that change your margin
Freight, duty and brokerage only affect unit cost when they are allocated to the receipt they belong to.
Keep every charge with its receipt
A supplier invoice without a receipt reference cannot be allocated to a specific unit cost.
Choose a basis your finance team accepts
Value, weight or volume each produce a different unit cost; document the choice.
Check the BOM afterwards
Confirm the new cost flowed into the product and that the quoted margin still holds.
IMPLEMENTATION
What to check before go-live
A short acceptance routine prevents most first-month surprises.
Run one family in parallel
Keep the old spreadsheet alongside the new system for one product family. Compare BOM levels, opening stock, requirement dates and job cost line by line.
Assign an owner to each difference
Every mismatch should have a person and a reason. Close the reasoning gaps before switching off the old record, not after.
SHOP FLOOR
Get operators to report progress without extra paperwork
Progress data is useful only when reporting it takes less effort than explaining it later.
One scan to identify the job
Put the work order identifier where the operator already stands, not at a separate desk.
Keep the status list short
Three or four clear states are easier to use than a detailed process taxonomy.
Report use at the point of consumption
Recording material against the job as it is used keeps inventory and job cost aligned.