MANUFACTURING & MRP
Production & Compliance
Built to adapt to discrete & batch manufacturing verticals.
Learn
03 / MATERIALS & PURCHASING
Know what to buy, how much, and when it needs to arrive.
Calculate dated material requirements from the production plan, then compare them with usable stock and open receipts. Review supplier lead times, price breaks and minimum quantities before releasing a purchase order.
- Required
- 40
- Covered
- 36
- Shortfall
- 4
- Available now
- 28 kits
- Inbound by May 18
- 8 kits
- Suggested purchase
- 4 kits, before supplier minimum
HOW IT WORKS
Materials & Purchasing in three steps.
- STEP 01
Identify dated shortages
Compare demand with available stock and expected receipts. See which job and need date are affected.
- STEP 02
Review and release a PO
Check supplier terms and expected arrival dates. Approve the proposed quantity or adjust it for the supplier minimum.
- STEP 03
Receive against the order
Post actual quantities and lot information. Keep late or partial receipts visible so planners can respond before a job is due to start.
01 / DATED NET REQUIREMENTS
See exactly what is missing on the assembly date.
Use the quantity required for the job, less usable stock and receipts due before the operation starts. Exclude late, reserved or quality-held supply from the coverage calculation.
- Gross requirement
- 40 kits
- Usable stock for this order
- −28 kits
- Existing PO due before need
- −8 kits
- Net shortage
- 4 kits
The eight inbound kits count toward the planning balance, but cannot be issued before receipt and clearance.
02 / SUPPLIER DECISION
Review the supplier minimum before approving a buy.
The net shortage is four kits. Compare the quantity suppliers will actually sell, the date they confirm and the excess inventory the buyer would own after the job.
- Short lead time
Supplier A · 4 kits
May 17 confirmed; covers the gap without excess. Review the expedite charge.
- Lower unit price
Supplier B · 10 kits minimum
May 20 confirmed; six excess kits and too late for the May 18 assembly.
In this example, choose Supplier A to protect the current schedule. Record why the lower unit price did not win.
03 / PURCHASE ORDER CONTROL
Turn a shortage suggestion into a supplier commitment.
Carry the item, demand reference and need date through buyer review. Keep the requested and promised receipt dates distinct, so a supplier acknowledgment cannot quietly move the production plan.
| Control | Buyer record | Why it matters |
|---|---|---|
| Approval | 4 kits from Supplier A | Matches the gap against WO-1042 |
| Requested receipt | May 17 | Leaves time for receiving and quality clearance |
| Supplier promise | May 17 | Confirm in writing and pass to planning |
| Production need | Before May 18 assembly | Escalate a promise that misses this cutoff |
This PO is for the extra four kits, separate from the eight kits on the existing inbound order.
04 / PARTIAL RECEIPTS
Close received quantities without losing the open balance.
Post only what arrives. Track quantity and lot on each receipt, and distinguish received stock from stock cleared for issue. A packing slip for the total order is not evidence that every kit is usable.
- May 17 AM
Receive 3 of 4 kits
Record the delivered lot and leave one kit open on the PO.
- May 17 PM
Receive the final kit
Post a separate receipt, then clear the four kits through receiving checks.
- May 18
Make 40 kits available to stage
Combine the cleared four-kit top-up with 28 on hand and eight from the existing PO.
If the last kit does not clear on time, report one uncovered unit to planning; do not count it as available.
05 / BUYER EXCEPTIONS
Give the planner a shortage update they can act on.
Keep the job, number of uncovered units, expected recovery date and buyer together. Review the largest schedule impact first instead of filtering only by supplier or PO date.
- Late promise
Buyer checks the supplier date
Ask for a recovery date and pass it to the planner to test the schedule.
- Quality hold
Receiving confirms usable quantity
Report the held quantity separately and verify whether replacement supply is needed.
- Approved substitute
Engineering signs off first
Confirm revision and traceability requirements before the warehouse issues an alternative.
Close a shortage when usable supply covers the job, not when the PO is sent.
PUMP ASSEMBLY EXAMPLE
Buy for the need date, not just the stock level.
Forty seal kits are needed on May 18. Twenty-eight are available and eight more are due in time, leaving a shortage of four.
The buyer still checks minimum quantity and delivery date before releasing a PO.
THE HANDOFF
What goes in. What comes out.
- INPUTS
- Dated material demand · Available stock · Open supply
- OUTPUT
- Reviewed purchase orders and a receiving plan
COMMON QUESTIONS
Materials & Purchasing FAQ
Does a shortage alert place an order automatically?
No. Buyers can review and approve the recommendation before releasing a purchase order.
How are partial deliveries handled?
Record the delivered quantity against the purchase order and leave the remaining quantity open with its expected receipt date.
KEEP EXPLORING
Continue the manufacturing workflow.
PERSONALIZED WALKTHROUGH
See materials & purchasing with your own data.
Bring a material with an open PO and an upcoming need date. See how the buyer and planner review a shortage together.