04 / SHOP FLOOR CONTROL
See what is running, what is blocked, and what is ready next.
Send clear work instructions to operators and collect progress where the work happens. Actual material issues, labor time, good output and scrap give planners and finance a record they can act on.
- Current operation
- Final assembly · Line 02
- Status
- 32 of 40 units complete
- Next operation
- Quality check · May 19
HOW IT WORKS
Shop Floor Control in three steps.
- STEP 01
Dispatch work to the floor
Give operators the job priority, operation, component list and instructions so they know what to run and what to report.
- STEP 02
Capture actual work at the source
Use a tablet or supported scanner to log progress, issue material lots, record time and report scrap.
- STEP 03
Close the operation and notify the next team
Record good output and exceptions, then move the finished or intermediate units to the next operation or into stock.
01 / DISPATCH BOARD
Show operators what is ready, running and waiting.
Dispatch by operation and work center. Put the active job, released instruction revision and next handoff where the shift lead can review them without opening the sales order.
| Operation | State at checkpoint | Next action |
|---|---|---|
| Motor module | Complete · 40 staged | Available to final assembly |
| Final assembly | Running · 32 of 40 complete | Finish the remaining eight |
| Quality check | Queued · May 19 | Inspect against revision C |
| Finished goods receipt | Not posted | Receive only after quality release |
The 32 completed units are at the assembly checkpoint. They are not yet sellable finished stock.
02 / OPERATOR REPORTING
Report progress without posting the same units twice.
Distinguish units completed during the reporting interval from cumulative job output. Record time separately from quantity so a second shift can pick up the work without re-entering the first shift’s figures.
- Job target
- 40 units
- Completed before this report
- 20 units
- Good units in this report
- +12 units
- Cumulative good assembly output
- 32 units
- Still to assemble
- 8 units
The next eight bring the assembly total to 40. Quality release and the finished-goods receipt are separate events.
03 / MATERIAL & LOT CONTROL
Trace what was actually used, not just what the BOM lists.
Record the component lot at issue, then reconcile material consumed, returned or scrapped. Keep a replacement part linked to the same work order so material usage and quality history tell the same story.
- Issue
Stage the approved lots
Post the issue of 40 seal kits against WO-1042 and record the lot references.
- Replace
Record one damaged kit
Post the component scrap and issue one replacement from separate unreserved stock.
- Reconcile
Close at 41 kits consumed
Forty kits remain in good assemblies and one was scrapped; no finished unit was scrapped.
The replacement is additional consumption, not part of the original four-kit shortage.
04 / EXCEPTION RESPONSE
Make a blocked job visible before the next shift inherits it.
An exception needs a reason, an owner and a next check. Keep the work order visible while resolving the issue, then record the decision before restarting or passing units to quality.
- Material damage
One seal kit damaged during assembly
Segregate the kit, post the scrap and ask stores for an approved replacement.
- Equipment stoppage
Estimated restart slips past the slot
Log downtime separately from labor and have the lead review the impact on inspection.
- Quality hold
An assembled unit fails a check
Keep it out of cleared stock until the disposition is recorded.
The material-damage case applies to WO-1042. The other cases are separate examples.
05 / SHIFT & QUALITY HANDOFF
Close the operation with a record the next team can use.
Before closing the job, reconcile the good quantity, posted material and reported time. Quality needs the inspection record; inventory needs the release; costing needs the actual hours and consumption.
- Operator
Confirm 40 good assembled units
Close final assembly and submit the actual labor record.
- Quality
Release 40 units after inspection
Record the May 19 result and resolve any open holds before release.
- Inventory
Post the finished receipt
Receive the 40 cleared assemblies and retain the work-order reference.
- Cost review
Check usage against the job
Pass the replacement kit and actual time through to the cost record.
The order is ready for the May 20 shipment after the completed units are received and assigned to the order.
PUMP ASSEMBLY EXAMPLE
Report actual progress at the point of work.
Line 02 has completed 32 of 40 units. Quality can see the next operation and the planner can see what is still outstanding.
Posting material issues and production receipts is separate from reporting progress.
THE HANDOFF
What goes in. What comes out.
- INPUTS
- Released work orders · Routing · Staged materials
- OUTPUT
- Completed quantities, time and consumption records
COMMON QUESTIONS
Shop Floor Control FAQ
Can operators record more than completed quantities?
Work orders can capture time, material issues, lot references and scrap alongside completed quantities.
Does reporting progress change inventory?
Inventory quantities update when material issues and production receipts are posted. A progress update by itself is not a stock transaction.
KEEP EXPLORING
Continue the manufacturing workflow.
PERSONALIZED WALKTHROUGH
See shop floor control with your own data.
Bring a work order and one shop-floor exception. See how operators record progress and how planners follow the handoff.