Learn
Inventory management
Know when inventory control needs a production plan.
The key decision is whether accurate stock and order handling are enough—or whether the system must also coordinate how products are made.
DECISION SUMMARY
Start with the job your system must do.
The key decision is whether accurate stock and order handling are enough—or whether the system must also coordinate how products are made.
PROCESS FIT
Separate stock movement from the act of making
Map receiving, picking, transfer and adjustment first. Then identify where a kit, assembly or production order needs material planning and completion reporting.
- 01Receive and store
- 02Reserve for demand
- 03Issue to a build
- 04Record finished output
Illustrative decision sequence — validate each step against your process.
DATA & CONTROL
Model what happens before a stockout
Test a component that is promised to orders and also required by production. Check how the next purchasing action accounts for both demands and incoming supply.
- 01Open order demand
- 02BOM requirement
- 03Incoming supply
- 04Buyer review
Illustrative decision sequence — validate each step against your process.
EVALUATION IN PRACTICE
Keep inventory, WIP and cost distinctions clear
Use a job with partially consumed material. Ask what is available to sell, what is committed, what remains in WIP and how actual usage is recorded.
- 01On hand
- 02Committed
- 03Work in progress
- 04Completed stock
Illustrative decision sequence — validate each step against your process.
SIDE-BY-SIDE EVALUATION
Compare evidence from the same workflow.
This checklist is a prompt for a product walkthrough, not a claim that feature names or plan boundaries are identical. Verify the current edition, configuration, integrations and scope with each vendor.
| Decision area | Boklink MRP · validate | inFlow · verify |
|---|---|---|
| Inventory and locations | Review the locations, transactions, reservations and counts your team uses. | Check location model, transaction controls and item-level workflows. |
| Kits and assemblies | Demonstrate how components become an assembled or sellable product. | Confirm kit versus manufacturing behavior, including cost and inventory effects. |
| Production planning | Test whether demand and BOMs produce dated work and material actions. | Verify whether full MRP, work orders and planning are part of your required setup. |
| WIP and job status | Follow issued material through a partially complete job. | Confirm whether WIP and operation-level progress are visible to your team. |
| Purchasing decisions | Compare on-hand, committed, incoming and production demand before buying. | Test replenishment logic and how manufacturing demand is represented. |
| Cost and reporting | Review the records needed to explain actual use and finished product cost. | Confirm costing method, production data and reports for your accounting workflow. |
Ask each vendor to demonstrate the workflow using the same sample data and success criteria.
WHO SHOULD SHORTLIST WHAT
Fit depends on your operating model.
Explore Boklink MRP if…
Product businesses that have strong inventory needs and are assessing how far into manufacturing their system should go.
Your evaluation needs to connect material requirements, production decisions and inventory records in one manufacturing workflow.
Keep inFlow in the conversation if…
A reseller or assembler with straightforward stock and kit workflows may prioritize inventory management over full production planning.
Test the product scope, configuration and dependencies required for your specific workflow before making a trade-off.
MIGRATION & EVALUATION PLAN
Move forward with evidence, not assumptions.
Use these steps to reduce data and workflow uncertainty. They are evaluation checkpoints, not a promised implementation schedule.
- STEP 01
Classify products and processes
Separate resale items, kits, light assembly and products requiring routings or multi-step production.
- STEP 02
Run a shared inventory scenario
Use a component consumed by both customer demand and a planned build.
- STEP 03
Measure the production visibility gap
Record what planning, purchasing and operators cannot see in the current inventory workflow.
- STEP 04
Select the right operating category
Choose inventory-first or MRP based on demonstrated work-order, WIP, material and costing requirements.
Set acceptance criteria with your operations and finance owners. Confirm data mapping, integrations, responsibilities and timing with the selected vendor.
FAQ
Questions to ask before you choose.
Use the answers as a starting point, then verify details for your team and configuration.
Is inventory software enough for a manufacturer?
It can be, when the operation mainly buys, stores and ships products or handles simple assemblies. Multi-step production often adds BOM, scheduling, WIP and job-costing requirements.
How can I compare inFlow for kit-based products?
Demonstrate component reservation, assembly or kit completion, finished inventory adjustment and cost records using your own product.
What is the difference between inventory availability and material planning?
Availability describes stock after relevant commitments; material planning also relates dated demand and product structure to what needs to be purchased or made.
When should we consider a dedicated MRP workflow?
Consider it when purchasing and production decisions depend on BOM explosion, work-order timing, material readiness or visibility into partially completed jobs.
SEE YOUR WORKFLOW IN CONTEXT
Bring one product and one real production question.
Review your BOM, stock position, production handoffs and exception scenario with the Boklink MRP team. Confirm product scope and fit against your requirements.