MANUFACTURING & MRP
Production & Compliance
Built to adapt to discrete & batch manufacturing verticals.
Learn
FROM SPREADSHEETS TO LIVE MRP
Replace spreadsheet reconciliation with operations that update as work happens.
Import products, materials, BOMs, stock, suppliers and open orders into a controlled system—then connect the channels and workflows your team already uses.
SIGNS IT IS TIME TO SWITCH
Where workbook-based operations start to slow down
Multiple versions of truth
Copied files and private formulas make ownership and timing impossible to verify.
Growth creates more admin
Each new warehouse, channel and product multiplies manual updates.
Decisions use stale data
By the time a spreadsheet is reconciled, orders and inventory have already changed.
SAMPLE MIGRATION DATA
Size the work before moving it
Illustrative scope for a multi-location manufacturer. These figures describe the sample dataset.
- Item master rows
- 2,480
- BOM records
- 318
- Stock locations
- 6
Spreadsheets vs Boklink
Compare what changes for the people who buy, plan, build and ship.
| Task | Spreadsheets | Boklink MRP |
|---|---|---|
| Stock by location | Separate tabs reconciled on a schedule | Receipts, transfers and counts update location balances |
| Available to sell | Formulas or manual reservations | Committed and available quantities shown separately |
| Orders | CSV exports and manual handoffs | Connected orders retain channel and fulfillment context |
| BOM changes | Copies and formulas updated by file owners | Product structures feed material and work-order planning |
| Replenishment | Demand and supplier lead times combined by hand | Review buy or make suggestions against current requirements |
| Batch history | Lot IDs and movements spread across files | Recorded receipts, consumption and shipments share lot history |
| Costs | Price and production calculations maintained separately | Recorded material and operations inform actual cost |
| Permissions | Access granted by file or sheet | Roles control visibility and operational actions |
| Integrations | Repeated imports and exports | Supported connections share operational transactions |
| Opening balance review | Compare files and counts manually | Validate named items, warehouses and opening quantities before cutover |
THREE-STEP MIGRATION
Move your data and test the handoffs
- Import and validate
Map existing items, units, stock and BOMs while identifying duplicates and format problems.
- Connect live workflows
Link sales, purchasing, production and warehouse transactions to one item master.
- Go live with control
Test opening balances, permissions and integrations before switching the source of truth.
ILLUSTRATIVE MIGRATION RESULT
Check what is ready before go-live
In the example workspace, 86% of mapped records have passed validation. The item master is marked ready, BOM entries are in review and opening stock still needs to be signed off by location.
A pilot team can then trace a test order through allocation, material planning and fulfillment and compare the posted quantities with its opening balances.
ILLUSTRATIVE EVALUATION STATEMENT
“Validate the opening stock, trial orders and work-order quantities before making Boklink your live source of truth.”
This is guidance for a sample evaluation scenario, not a customer testimonial or a claim of measured customer results.
FREQUENTLY ASKED QUESTIONS
Moving from spreadsheets to Boklink FAQ
What data can be migrated from spreadsheets?
Typical scope includes items, materials, BOMs, opening stock, suppliers and open orders, subject to implementation review.
Do we need to replace every current tool?
No. Relevant ecommerce, accounting, shipping or partner tools can remain connected.
How is migration validated?
Teams review mapped data, opening balances and test transactions before go-live approval.
When should a manufacturer move off spreadsheets?
Consider a live system when stock and orders must be reconciled across channels or locations, or when BOM changes routinely reach production late.
How long does a migration take?
Timing depends on data cleanup, locations, workflow scope and integration testing. Set the cutover date after the team has run a trial import.
How are duplicate SKUs and inconsistent units handled?
Normalize identifiers and units in the import mapping. Resolve duplicate or conflicting rows before approving the item master.
Can we start with a single warehouse or product family?
Yes. Define the pilot scope and verify which cross-location transactions or shared materials need to be included.
What should we test before cutover?
Test a receipt, a sale, a transfer and a representative work order. Reconcile opening balances by item and location before your team signs off.
How can we evaluate the cost of switching?
Compare the plan and implementation scope with your current reconciliation time, inventory adjustments and any manual integration work.
Scope your first migration
Bring your item master and a sample BOM. Review the records to import and the transactions to test together.