Boklink

BOKLINK SUITE Part of boklink.com — Native sync with Boklink Accounting, Inventory & B2B Portal
Zero-Risk Onboarding

Go Live in 3–6 Weeks — Not 12 Months

Every subscription includes a dedicated Boklink implementation engineer and free historical data migration.

WEEK 1

Blueprint & Data Import

We clean and import your SKUs, multi-level BOMs, supplier lists, and opening lot balances from Excel, QuickBooks, or Fishbowl.

WEEK 2

Integrations & Warehouse Bins

Connect Shopify, Amazon, QuickBooks/Xero, and map warehouse bin zones, reorder points, and barcode labels.

WEEKS 3–4

Role Training & Dry Run

Hands-on workshops for buyers, shop-floor leads, and finance using your real work orders and landed cost scenarios.

WEEKS 5–6

Production Cutover & Live SLA

Switch off legacy spreadsheets with live floor support and sub-15-minute response times from real MRP specialists.

BEFORE WEEK 1

Prepare these inputs before the kickoff

You do not need perfect data. You need a identifiable starting set that can be checked against a known product and order.

01

Items and units

SKUs, descriptions, units of measure and preferred suppliers.

02

Bills of materials

At least one multi-level BOM with quantities and routing steps.

03

Opening balances

On-hand quantities by location, with lot and expiry dates where relevant.

04

Open demand

Current sales orders, purchase orders and work orders with due dates.

DATA MAPPING

How spreadsheet columns become manufacturing records

Mapping is a review step, not a blind import. Each source column gets a destination field, a rule and an owner who signs off.

Source columnDestinationCheck before import
Item codeItem masterUnique, consistent casing, no duplicates
Component qtyBOM lineUnit matches parent and child
Supplier lead timePurchasing recordIn days, agreed with purchasing
Lot / expiryInventory lotDate format and expiry rule confirmed

See the migration questions for common exceptions.

ROLE TRAINING

Each team practices on its own records

PLANNERS

From demand to release

Run net requirements on a live order, review exceptions, then decide what to release and what to hold.

BUYERS

From requirement to receipt

Convert a suggestion into a purchase order, receive partially, and confirm the effect on cost and stock.

OPERATORS

From job to reported progress

Scan the work order, report a stage change and record material use from the station screen.

FINANCE

From transaction to actual cost

Trace a completed job into inventory value and compare planned versus actual material cost.

PARALLEL RUN

Acceptance checks before you switch off spreadsheets

Run one product family through both systems. Keep the old record as a reference until the differences are understood, not merely close enough.

  • BOM comparison. Same levels, quantities and routing steps on both sides.
  • Stock reconciliation. Location and lot balances agree at the cutover point.
  • Date check. Suggested order need dates match the agreed lead-time rules.
  • Cost trace. A completed job can be traced from issue to inventory value.

ROLLOUT RISKS

Where implementations usually slow down

Unclear item identifiers

Agree one code per item and one unit rule before importing BOMs.

Unowned opening balances

Name the person who confirms stock by location at the cutover point.

Late supplier data

Lead times drive requirement dates; confirm them before planning goes live.

Operator access gaps

Test scanning on the actual devices and floor network before cutover.

AFTER GO-LIVE

A practical first 90 days

DAYS 1–30

Stabilize the core

Keep BOMs, stock and work orders current. Capture exceptions in a shared list instead of working around them.

DAYS 31–60

Tighten the rules

Review lead times, reorder points and lot rules against what actually happened on the floor.

DAYS 61–90

Extend the scope

Add a second product family, a new integration or a B2B channel once the first workflow is stable.

TALK TO A SPECIALIST

Bring one order to the conversation

A walkthrough on your own data is the fastest way to see which parts of the rollout need attention before you start.

Scroll to Top