Materials & Purchasing

03 / MATERIALS & PURCHASING

Know what to buy, how much, and when it needs to arrive.

Calculate dated material requirements from the production plan, then compare them with usable stock and open receipts. Review supplier lead times, price breaks and minimum quantities before releasing a purchase order.

DATED MATERIAL SHORTAGEPO REVIEW · Pump assembly
Buyer action needed
Required
40
Covered
36
Shortfall
4
Available now
28 kits
Inbound by May 18
8 kits
Suggested purchase
4 kits, before supplier minimum
● SAMPLE DATAIllustrative workflow

HOW IT WORKS

Materials & Purchasing in three steps.

  1. STEP 01

    Identify dated shortages

    Compare demand with available stock and expected receipts. See which job and need date are affected.

  2. STEP 02

    Review and release a PO

    Check supplier terms and expected arrival dates. Approve the proposed quantity or adjust it for the supplier minimum.

  3. STEP 03

    Receive against the order

    Post actual quantities and lot information. Keep late or partial receipts visible so planners can respond before a job is due to start.

01 / DATED NET REQUIREMENTS

See exactly what is missing on the assembly date.

Use the quantity required for the job, less usable stock and receipts due before the operation starts. Exclude late, reserved or quality-held supply from the coverage calculation.

Seal kit · May 18 material balance
SAMPLE DATA
Gross requirement
40 kits
Usable stock for this order
−28 kits
Existing PO due before need
−8 kits
Net shortage
4 kits

The eight inbound kits count toward the planning balance, but cannot be issued before receipt and clearance.

02 / SUPPLIER DECISION

Review the supplier minimum before approving a buy.

The net shortage is four kits. Compare the quantity suppliers will actually sell, the date they confirm and the excess inventory the buyer would own after the job.

Four-kit shortage · Buyer review
SAMPLE DATA
  • Short lead time

    Supplier A · 4 kits

    May 17 confirmed; covers the gap without excess. Review the expedite charge.

  • Lower unit price

    Supplier B · 10 kits minimum

    May 20 confirmed; six excess kits and too late for the May 18 assembly.

In this example, choose Supplier A to protect the current schedule. Record why the lower unit price did not win.

03 / PURCHASE ORDER CONTROL

Turn a shortage suggestion into a supplier commitment.

Carry the item, demand reference and need date through buyer review. Keep the requested and promised receipt dates distinct, so a supplier acknowledgment cannot quietly move the production plan.

PO-1042 · Seal-kit top-up
SAMPLE DATA
ControlBuyer recordWhy it matters
Approval4 kits from Supplier AMatches the gap against WO-1042
Requested receiptMay 17Leaves time for receiving and quality clearance
Supplier promiseMay 17Confirm in writing and pass to planning
Production needBefore May 18 assemblyEscalate a promise that misses this cutoff

This PO is for the extra four kits, separate from the eight kits on the existing inbound order.

04 / PARTIAL RECEIPTS

Close received quantities without losing the open balance.

Post only what arrives. Track quantity and lot on each receipt, and distinguish received stock from stock cleared for issue. A packing slip for the total order is not evidence that every kit is usable.

PO-1042 · Illustrative receipt log
SAMPLE DATA
  1. May 17 AM

    Receive 3 of 4 kits

    Record the delivered lot and leave one kit open on the PO.

  2. May 17 PM

    Receive the final kit

    Post a separate receipt, then clear the four kits through receiving checks.

  3. May 18

    Make 40 kits available to stage

    Combine the cleared four-kit top-up with 28 on hand and eight from the existing PO.

If the last kit does not clear on time, report one uncovered unit to planning; do not count it as available.

05 / BUYER EXCEPTIONS

Give the planner a shortage update they can act on.

Keep the job, number of uncovered units, expected recovery date and buyer together. Review the largest schedule impact first instead of filtering only by supplier or PO date.

Shortage queue · Who acts next
SAMPLE DATA
  • Late promise

    Buyer checks the supplier date

    Ask for a recovery date and pass it to the planner to test the schedule.

  • Quality hold

    Receiving confirms usable quantity

    Report the held quantity separately and verify whether replacement supply is needed.

  • Approved substitute

    Engineering signs off first

    Confirm revision and traceability requirements before the warehouse issues an alternative.

Close a shortage when usable supply covers the job, not when the PO is sent.

PUMP ASSEMBLY EXAMPLE

Buy for the need date, not just the stock level.

Forty seal kits are needed on May 18. Twenty-eight are available and eight more are due in time, leaving a shortage of four.

The buyer still checks minimum quantity and delivery date before releasing a PO.

THE HANDOFF

What goes in. What comes out.

INPUTS
Dated material demand · Available stock · Open supply
OUTPUT
Reviewed purchase orders and a receiving plan

COMMON QUESTIONS

Materials & Purchasing FAQ

Does a shortage alert place an order automatically?

No. Buyers can review and approve the recommendation before releasing a purchase order.

How are partial deliveries handled?

Record the delivered quantity against the purchase order and leave the remaining quantity open with its expected receipt date.

PERSONALIZED WALKTHROUGH

See materials & purchasing with your own data.

Bring a material with an open PO and an upcoming need date. See how the buyer and planner review a shortage together.