Inventory & Costing

05 / INVENTORY & COSTING

Know what is in stock and what each job actually cost.

Follow materials through receiving, production and shipment. Compare actual material, labor and overhead with the estimate to explain the variance and improve the next quote.

CLOSED JOB COSTWO-1042 · Pump assembly
Variance to review
Estimated
$4,400
Actual
$4,520
Over estimate
+$120
Finished stock received
40 units
Planned / actual cost per unit
$110 / $113
Over estimate per unit
+$3
● SAMPLE DATAIllustrative workflow

HOW IT WORKS

Inventory & Costing in three steps.

  1. STEP 01

    Track stock by stage and location

    Separate on-hand, reserved, available, incoming and work-in-progress quantities. Track item, location and lot where relevant.

  2. STEP 02

    Assign costs as transactions happen

    Post actual issues and production receipts. Include recorded labor and overhead when calculating the cost of the completed job.

  3. STEP 03

    Explain the variance before the next quote

    Compare planned and actual cost and review what changed: purchase price, material usage, labor time or scrap.

01 / STOCK AVAILABILITY

Separate what is on the shelf from what is free to promise.

Physical inventory, job reservations and quality holds answer different questions. Show the usable balance for the current job separately from the quantity already committed to another order.

WO-1042 · Finished lot before dispatch
SAMPLE DATA
Finished assemblies received
40 units
On quality hold
0 units
Reserved for SO-1042
−40 units
Available for another order
0 units

All 40 units are physically in finished stock at this checkpoint, but none is free to promise to another customer.

02 / INVENTORY TRANSACTIONS

Follow the quantity from component issue to customer shipment.

Show the posting that changes the balance at each stage. A progress report can tell the planner what is happening, but does not itself move material into or out of stock.

WO-1042 · Inventory movement trail
SAMPLE DATA
  1. Material issue

    Raw material → work in progress

    Issue 40 seal kits, then one replacement; record the damaged kit against the job.

  2. Progress

    Work in progress stays open

    32 assembled units are an operational checkpoint, not a stock receipt.

  3. Production receipt

    Work in progress → finished goods

    Receive 40 cleared units after May 19 inspection.

  4. May 20

    Finished goods → customer shipment

    Ship the 40 units reserved for SO-1042.

Keep the lot and work-order references on the posted records. Correct errors with a traceable adjustment, not by rewriting the history.

03 / PLANNED VS ACTUAL

Reconcile every dollar of the $120 overrun.

Compare the same scope on both sides: 40 good pump assemblies under the same job. A component loss and extra labor changed actual cost even though shipment quantity stayed the same.

WO-1042 · Job cost bridge (USD)
SAMPLE DATA
Cost driverEstimateActualVariance
Materials$3,120$3,180+$60
Direct labor$840$900+$60
Machine & overhead$440$440$0
Total job cost$4,400$4,520+$120
Per good unit$110$113+$3

Material increased by $60 for the replacement kit. Labor increased by two hours at $30 per hour, from 28 to 30 hours.

04 / VARIANCE REVIEW

Separate a one-off loss from a repeatable cost driver.

Investigate the events behind unfavorable variance before updating a standard or a quoting rate. The extra material and labor on this job are evidence to review, not automatic changes to every future estimate.

WO-1042 · Variance disposition
SAMPLE DATA
  • +$60 · Material usage

    One additional seal kit

    Check the scrap posting and whether the damage points to a recurring handling problem.

  • +$60 · Labor time

    Two extra direct-labor hours

    Review reported time and decide whether setup or run assumptions should change.

  • $0 · Machine and overhead

    No change in this example

    Carry the original assumption forward unless the underlying rate or method has changed.

Keep the approved $4,400 baseline and the $4,520 actual visible after close so the reason for the difference is not lost.

05 / NEXT-QUOTE FEEDBACK

Use the closed job to improve the next estimate.

The original sales order stays at $150 per unit. Use closed-job history to review the next quote, and show how costs changed gross margin without rewriting the accepted price.

SO-1042 · Margin after job close
SAMPLE DATA
At 40 unitsQuote estimateClosed-job result
Revenue$6,000$6,000
Job cost$4,400$4,520
Gross profit$1,600$1,480
Gross margin26.7%24.7%

The estimated and actual margins are both based on this job’s cost and the same sales price. Keep the approved quote intact.

PUMP ASSEMBLY EXAMPLE

Carry the actual cost into the next quote.

The job closed at $4,520 compared with a $4,400 estimate. Across 40 units, that is $3 more per unit than planned.

Review material usage and labor time before changing a standard cost or quoting the next order.

THE HANDOFF

What goes in. What comes out.

INPUTS
Stock movements · Production output · Actual job costs
OUTPUT
Available stock, a closed job and a cost variance

COMMON QUESTIONS

Inventory & Costing FAQ

How is available stock different from on-hand stock?

On-hand is the physical balance. Available stock excludes quantities already reserved or unavailable for use.

How do I compare actual and quoted cost?

Compare posted material, labor and overhead with the estimate at the same quantity and scope. Review variances before updating reference costs for future quotes.

PERSONALIZED WALKTHROUGH

See inventory & costing with your own data.

Bring the estimate and recorded costs for a completed job. Walk through what changed and what to use on the next quote.